We were contacted by the hotel manager to provide a quotation to design, supply and install a comfort cooling air conditioning system for the gymnasium as the existing air conditioning system was defunct.
We installed 2 number Mitsubishi Electric ceiling cassette type Twin split system and 2 number split systems within the cardio and dance room.
The gymnasium down time was minimized whilst the installation was carried out safely.
No results found.
